![](https://5kx2af.p3cdn1.secureserver.net/wp-content/uploads/2021/06/200006988.jpg?time=1722020290)
Project Details
The fuel supplier’s truck in Congo was used for sewage, water, and many other than fluids than fuel. As a result, the fuel arrived so contaminated that the rig would shut down after only a few hours runtime. Invena built upon military technology to devise a fuel purification skid that can clean fuel up to 50% mud, water, and debris continuously. The system is powered by purified fuel, requiring no external power source.
Project Info
Category
Projects
Date
26 Aug, 2009
Client
Halliburton